Sorry you were unable to use our quote form. In any case, we need some specifics before we can provide an accurate quote. Please reply by e-mail with your selections below (simply delete the choices you don't want leaving the desired options): 1. Power Rating (kW): 2. Frequency (Hz): Select... 60Hz, 50Hz 3. Voltage and Phases: Select... 120/240V 1-Phase, 120/208V 3-Phase, 120/240V 3-Phase, 277/480V 3-Phase, other__________ 4. Type of Service: Select... Standby, Prime, Not Sure 5. Environmental Conditions (elev & temp): Select Elev... 0-1000 ft 1000-2000 ft 2000-3000 ft 3000-4000 ft 4000-5000 ft 5000-6000 ft 6000-7000 ft over 7000 ft Select Temp... Standard 104F(40C) max Extended 122F(50C) max 6. Automatic Transfer Switch: Select... None Required, Req'd - match gen current, Req'd - for higher current____________ 7. Main Generator Output Breaker: Select... Yes - required, Not required 8. Vibration Isolators: Yes - Required, Not required 9. Enclosure Housing: Select... Open - no enclosure, Standard Weather Enclosure, Quiet Weather Enclosed, Extra Quiet Weather Enclosed 10. Engine Block Heater: Yes - required, Not Required 11. Trailer Mounting: Select... Not Required, DOT Rated Trailer Mounting 12. Remote Annunciator: Select... None required, 5 Light w/ control upgrade, 12 Light w/ control upgrade 13. Export Boxing: Select... Not required, Required 14. Fuel Type: Select... Propane, Natural Gas, diesel 15. Diesel tank size: Select... N/A, not req'd (by others), 12hr base mounted UL double walled, 24hr base mounted UL double walled, base mounted UL day tank only with control 16. Diesel Fuel Water separator: Select... N/A, Yes, No 17. Exhause Silencer: Select... Industrial Grade, Residential Grade, Critical Grade 18. Automatic Float Battery Charger: Select... Required, Not Required 19. Engine Governor Type: (electronic recommended if powering frequency sensitive loads like computers, UPS systems, etc.) Select... mechanical, electronic 20. Quantity to be ordered at one time: 21. Types of Loads to be powered by GenSet: 22. Is this a new application or replacement of an existing GenSet? Select... new installation, replacement of existing genset 23. What is required installation date? 24. Project Installation & Completion Certainty: Select... very certain, 50-50 chance, uncertain see comments 25. Comments & Other Requirements: 26. Job Site (City, State Zip): 27. Your Name: 28. Your Title: 29. Company: 30. Street: 31. City, State Zip 32. Phone: 33. Your E-mail Address: Please paste this text into an e-mail message and edit the answers. Send to info@NoOutage.com for a quote.