Generator Backup Lead Times


Home ] Up ] Contents ] Search ] Catalog ]

Page last updated 03/29/07
 

 

bulletPortable Generators

bulletRV/Mobile Generators

bulletPTO Generators

bulletAutomatic Standby Generators
bulletAutomatic Transfer Switches

bulletCords & Wiring Devices

bulletManual Switches & Panels

bulletPortable Power Distribution

 

Portable Generators

table-arrow.gif (695 bytes)

Description

Brand

Lead Time
(to ship, after order accepted)

PM0497000, PM0601100, PM0606500 7000W & 11000W, 120/240V with Honda engines Coleman Powermate 8 weeks
all other Coleman models 1500W to 11000W, 120/240V Coleman Powermate 2-4 weeks
30204, 1894, 9801 5250W, 7000W, 10000W, 120/240V Briggs & Stratton 2-4 days
4.0EGHEB, 6.0EGHEB 2000W to 5000W, 120/240V Cummins 2-3 days
HOV5000VE, HPP6-B, CHD11000KES, CHD15000KES 5500W to 13500W, 120/240V Winpower 2-4 weeks
         

 

 

RV/Mobile Generators

table-arrow.gif (695 bytes)

Description

Brand

Lead Time
(to ship, after order accepted)

gasoline gensets most sizes & models Cummins 1-2 weeks
LP gensets most sizes & models Cummins 2-3 weeks
diesel gensets most sizes & models Cummins 2-3 weeks
         

 

 

PTO Generators

table-arrow.gif (695 bytes)

Description

Brand

Lead Time
(to ship, after order accepted)

PTO15-12, PTO30-25 12kW to 31kW, 120/240V single phase VOLTmaster 4-6 weeks
14/11PTCD, 50/30PTCD 7kW to 30kW, 120/240V single phase Winpower 2-3 days
10/7PTCD, 18/15PTCD 15kW, 120/240V single phase Winpower 8 weeks
other generators larger generators and 3 phase models Winpower 2-3 weeks
         

 

 

Automatic Standby Generators

table-arrow.gif (695 bytes)

Description

Brand

Lead Time
(to ship, after order accepted)

1897/CHGEN 7kW Home Standby B & S 1-2 weeks
1931/CHGEN 10kW Home Standby B & S 1-2 weeks
1815/CHGEN 12kW Home Standby B & S 1-2 weeks
PM400911, PM401211, PM402511 10kW, 11kW, 25kW PowerStation Coleman 4-6 weeks
12GHAB/101(RS12000) 11kW Residential Standby Cummins 1-2 weeks
other LP gensets most sizes with standard options Cummins 4-6 weeks
diesel gensets most sizes with standard options Cummins 5-7 weeks
         

 

 

Automatic Transfer Switches

table-arrow.gif (695 bytes)

Description

Brand

Lead Time
(to ship, after order accepted)

RLC1-100, RLC1-200 100A & 200A, NEMA 1 & NEMA 3 Residential Eaton Cutler-Hammer 2-4 weeks
ATC3C2 other Contactor-based transfer switches 100A-600A Eaton Cutler-Hammer 2-4 weeks
AST2225-2E 225A, 120/240V, 1ph, NEMA 4 DynaGen 2-3 weeks
ZTX Series 40-400A, NEMA 1 & NEMA 3 GE Zenith 8 weeks min
ZTX Series 100A, 200A, 400A single phase GE Zenith 8 weeks min
ZTG Series 40-400A, NEMA 1 (NEMA 3 longer) GE Zenith 8 weeks min
RSZ100-N1, RSZ100-N3R, RSZ200-N1, RSZ200-N3R 100A & 200A, 120/240V 1ph, NEMA 1 & NEMA 3 Cummins 2 weeks
RST60/178, RST100/177, RST200/176 60A to 200A, 120/240V 1ph, NEMA 1 Cummins 8 weeks
         

 

 

Cords & Wiring Devices

table-arrow.gif (695 bytes)

Description

Brand

Lead Time
(to ship, after order accepted)

most items most items all 1 week or less
         

 

 

Manual Switches & Panels

table-arrow.gif (695 bytes)

Description

Brand

Lead Time
(to ship, after order accepted)

15114 15A 120V, 4 circuit load-side indoor Gen/Tran 1-2 days
--- 30A 120/240V 10 circuit Pro/Tran® 1-2 days
Q310AE, Q310CE 30A 120/240V 10 circuit with electronic meter Pro/Tran® 1-2 days
Q-series 30A-50A 120/240V 6-10 circuit Pro/Tran® 2 weeks
all other surface mount,
all other flush mount
20A-50A 120/240V 6-10 circuit Pro/Tran® 1-2 weeks
all outdoor 20A-50A 120/240V 6-10 circuit Pro/Tran® 1-2 weeks
TCA0603D, TCA1003D 60A & 100A 120/240V Single-circuit indoor Panel/Link 1-2 days
TCA0603DR, TCA1003DR 60A & 100A 120/240V Single-circuit outdoor NEMA 3R Panel/Link 1-2 days
all other indoor TCA-D series  all other 60A-120A 120/240V Single-circuit indoor Panel/Link 1 week
outdoor other TCA-DR & TWB-DR series all other 60A-200A 120/240V Single-circuit outdoor NEMA 3R Panel/Link 1 week
200660, 301060, 501210 20A-50A transfer sub-panel indoor Gen/Tran 3-5 days
R200660, R301060, R501210 20A-50A transfer sub-panel outdoor NEMA 3R Gen/Tran 3-5 days
all other TRC, TTV series 20A-50A transfer sub-panel indoor Panel/Link 1 week
all other TRC, TTV series 20A-50A transfer sub-panel outdoor NEMA 3R Panel/Link 1 week
         

 

 

 

Home ] VIEW SHOPPING CART ] Product Lead Times ] Outage Archives ] Utility Industry ] Why You Need Backup ] Personal Stories ] NoOutage Configurations ] Safety ] Sizing for Your Needs ] Test Reports ] Placing Order ] Equipment Leasing ] Financing ] Frequently Asked ] Future Technologies ] Electricity Glossary ] Who We Are ] Why Buy Here ] Our Customers ] Pick a Contractor ] Privacy Promise ] Safe Shopping Guarantee ] Terms & Conditions ] What's New ] Contacting Us ] e-mail Flyer Signup ] Generator Shortage ] Links ] Help Hurricane Victims ] Help Tsunami Victims ] Made in USA ] Gift Ideas ] Videos ] Credit Card Security ] Redeem Coupon ]

Are YOU ready for the next power outage?

We welcome your feedback or questions.  Click here to contact us.
See our Terms & Conditions before using information or ordering from this web site.