Page last updated Jul 16, 2011 @ 12:18am

OTEC800

Onan-OTEC.jpg (34073 bytes)
typical photos specs for non-service entrance rated specs for service entrance rated
Click thumbnail image above to enlarge

Automatic Transfer Switch
800 amp
with exerciser clock kit & charger

 

The OTEC Open Transition Transfer Switch provides dependable load transfer for emergency and standby applications.  Featuring an easy-to-use microprocessor-based control panel, this switch provides reliable and cost-effective load transfer between a utility service and generator set.

Standard Features

* Open transition load transfer with selectable phase check or programmed transition.
* 3-phase voltage sensing on the normal source; single phase sensing on the generator.
* Front panel indicators and push buttons for ease of set-up.
* Simple-to-read control panel that features universal symbols for easy status recognition.
* Adjustable time delays.
* Integral exerciser clock.
* UL/NEMA 1 indoor enclosure.
* UL Listed and CSA Certified.

Optional Features

* Service entrance rated disconnect
* Fully programmable exerciser clock.
* Elevator signal relay.
* Battery chargers.
* UL/NEMA 3R, 4, 12 enclosures.

Specs

Switch Current Rating 800 amps
Poles 3 pole with solid neutral
Voltage Rating 600Vac maximum
Transfer Time 6 cycles max at 60Hz with nominal voltage applied to actuator (without delayed transition enabled)
Operating Temperature -22F to +140F (-30C to +60C)
Operating Humidity 95% relative humidity, non-condensing
Altitude up to 10,000 feet without derating
Microprocessor Control
- start time delay: 0-10 seconds adj.
- transfer time delay: 0-300 seconds adj.
- retransfer time delay: 0-30 minutes adj.
- stop time delay: 0-30 minutes adj.
- programmed transition 0-10 sec adj.
- undervoltage sensing of normal source:
   pickup 90% to 95% of nominal adj.
   dropout 70% to 90% of nominal adj.
   dropout time delay: 0.1-1.0 seconds adj.
- undervoltage sensing of generator:

   pickup 90% of nominal
   dropout 75% of nominal
   dropout time delay: 0.1-1.0 seconds adj.
- frequency sensing of generator:
   pickup 90% of nominal
   dropout 75% of nominal
Options Included - 2 amp battery charger
Other Options Available at additional cost
(partial listing)
- 40A, 70A, 125A, 150A, 225A, 260A, 300A,
   400A, 600A, 800A, 1000A ratings

- 120VAC through 600VAC
- 4 pole with switched neutral
- 50Hz
- 3 phase 3 wire or 4 wire
- type 3R, 4, 12 enclosures
- service entrance rated disconnect (through 800A)
Lug Capacities
Caution: Do not run control wiring through power cable conduit or raceway.
(4) 250-500MCM
Enclosure UL type 1 indoor (types 3R, 4, 12 optional)
Color Cummins
Nominal Dimensions (H x W x D) see spec sheet above
Weight see spec sheet above

NOTE:
This switch is available with service entrance rating as an optional adder.  Without this option you normally will need a service entrance rated disconnect between this switch and your power company meter.

 

 






Item Number: OTEC800
Price: $6,263
Price last updated 1/3/2010
Shipping Weight: 360 lbs.
This item normally ships in approximately 4 weeks or less.
If not paying by credit card contact NoOutage before placing order.

 

Are YOU ready for the next power outage?

 1 Video Introduction
 2 Outage Archives
 3 Utility Industry
 4 Why You Need Backup
 5 Personal Stories
 6 NoOutage Configurations
 7 Safety
 8 Sizing for Your Needs
 9 Voltage Drop Calculator
10 Test Reports
11 Placing Order
12 Equipment Leasing
13 Books & Videos  
14 Financing
15 Frequently Asked
16 Future Technologies
17 Electricity Glossary
18 Help with Plug Types
19 Who We Are
20 Why Buy Here
21 Our Customers
22 Pick a Contractor
23 Privacy Promise
24 Safe Shopping Guarantee
25 Terms & Conditions
26 What's New
27 Contacting Us
28 Generator Shortage
29 Parts & Service
30 Made in USA
31 Links

We welcome your feedback or questions.  Click here to contact us.
See our Terms & Conditions before using information or ordering from this web site.
Copyright © 1999-2010 NoOutage.com LLC.  All rights reserved.